Corragh Wind Farm Project
The Carrickallen Wind Farm was granted planning permission by An Bord Pleanála in 2014 . It is located near Bindoo and Mountain Lodge wind farms in Co. Cavan. The development comprises 10 no. wind turbines and all ancillary infrastructure including turbine foundations, crane hardstandings, site entrances, access tracks, internal wind farm underground cabling, a meteorological mast and all associated site development works.
Carrickallen is a joint ownership between Galetech Energy and Greencoat Renewables
It has been operational since January 2019.
Wind Farm Output
20MW
Turbines
10
Homes Powered
13,700
CO₂ Saved
14,700 tonnes of CO₂ /year
Community Fund
Up to €20,000/year
Locations
Located near Bindoo and Mountain Lodge wind farms in Co. Cavan


FAQs


Community Consultation
We’re here to listen and support our local community.
Freephone: 1800 140 240
Email: deirdre@galetechenergy.com
Contact us down below.

Awards and Certifications

About The Project
Carrickallen Wind Farm is a consented wind energy development. It comprises of wind turbines with blade tip heights of up to 68 m, each generating 20.5 megawatts. The project includes turbine foundations, access tracks and crane hardstands, underground cabling to connect the turbines, an on-site electricity control building and a grid connection to the appropriate node on the national electricity network.
The development is located near Bindoo and Mountain Lodge wind farms in Co. Cavan. Collectively, the turbines generate enough clean, renewable electricity to supply too around 13,700 houses each year.