Expert delivery of earthworks, drainage, foundations and reinforced concrete to support safe, compliant and build-ready developments.

Civil Engineering & Groundworks

Earthworks, drainage, roads, utilities and reinforced concrete delivered with full QA.


What you get:

  • Setting-out & temporary works

  • RC foundations, slabs & drainage

  • Test and inspection records

Utilities & Site Infrastructure

Ducting, chambers, diversions and grid/water connections integrated to programme.


What you get:

  • Services installation & tie-ins

  • Testing & commissioning

  • As-builts and documentation

Temporary & Enabling Works

Site setup and safe access that keep programmes moving.


What you get:

  • Traffic management / TM plans

  • Hoarding, platforms & cranage prep

  • Temporary works design & checks

Plant & Specialist Equipment Hire

Certified machinery, operators and tooling delivered on time and ready to work.


What you get:

  • Specified kit & certification

  • Delivery, setup & on-site support

  • Safety checks and returns

Filter items by Sector

Case Studies

Proven expertise in delivering sustainable projects from concept to completion.

DPD Warehouse - 1,300 m² Industrial Unit + Offices
DPD Warehouse - 1,300 m² Industrial Unit + Offices

DPD Warehouse - 1,300 m² Industrial Unit + Offices

New 1,300 m² industrial unit with offices and 20 kV substation; full site works

Gaelscoil Access Road - 300 m & Car Park (Civils)
Gaelscoil Access Road - 300 m & Car Park (Civils)

Gaelscoil Access Road - 300 m & Car Park (Civils)

Design & construction of a 300 m access road and car park (32 spaces), new footpaths, drainage, barriers, fencing, signage, and service ducts; Cock Hill realignment for turning lane; new crossing & line marking.

Alpha Storage - 1,000 m² Industrial Building
Alpha Storage - 1,000 m² Industrial Building

Alpha Storage - 1,000 m² Industrial Building

1,000 m² storage facility incl. associated site works.

Storage Unit - 450 m² Industrial Building
Storage Unit - 450 m² Industrial Building

Storage Unit - 450 m² Industrial Building

Design & build 450 m² sports storage facility incl. associated site works.

Gaelscoil Cavan - School Extension (450 m²)
Gaelscoil Cavan - School Extension (450 m²)

Gaelscoil Cavan - School Extension (450 m²)

Single-storey extension with link corridor, two SEN classrooms and one mainstream classroom incl. toilets; associated foundations, drainage, footpaths and handrails.

Doohamlet National School — Modular SEN Accommodation
Doohamlet National School — Modular SEN Accommodation

Doohamlet National School — Modular SEN Accommodation

Single-storey prefabricated building delivering two SEN classrooms, toilets, safe-space rooms, plus full civils (foundations, retaining walls, drainage, paths, fencing, handrails, soft-play) and connections—delivered in one phase.

Cherry Orchard Hospital - Modular Training Unit
Cherry Orchard Hospital - Modular Training Unit

Cherry Orchard Hospital - Modular Training Unit

Purpose-built modular training unit providing a flexible, scalable environment for clinical education and emergency-response training scenarios.

Bruskey - School Grounds Upgrade
Bruskey - School Grounds Upgrade

Bruskey - School Grounds Upgrade

Playground resurfacing, new drainage & footpaths, gravel paths, fencing and handrails at a national school.

St Anne’s NS, Bailieborough - Playground & Civils
St Anne’s NS, Bailieborough - Playground & Civils

St Anne’s NS, Bailieborough - Playground & Civils

Playground surfacing upgrade, kerbing, drainage and soft-play works.

Cuan Centre - Ground Works
Cuan Centre - Ground Works

Cuan Centre - Ground Works

Project listed on the site under Civils; the dedicated page isn’t loading reliably, so only high-level information is available here.

Scoil Iósaf, Newcastle West - General & SET Classrooms
Scoil Iósaf, Newcastle West - General & SET Classrooms

Scoil Iósaf, Newcastle West - General & SET Classrooms

Supply & installation of two 65 m² general classrooms and three 16 m² Special Education Teacher (SET) classrooms.

St Joseph’s Secondary School, Foxford - Modular Science Lab
St Joseph’s Secondary School, Foxford - Modular Science Lab

St Joseph’s Secondary School, Foxford - Modular Science Lab

Supply & erect a 128 m² modular science laboratory with associated site works.

Sequence 04.gif

Why Galetech?

Our in-house planners, engineers, grid specialists and finance analysts work as one integrated team, so you get clear decisions, fewer hand-offs and faster progress. We handle everything from community consultation to biodiversity to grid and finance, giving you a single, accountable partner from first map pin to construction-ready project.

One Team, One Plan

Site finders, consent leads and grid experts under one roof – no finger-pointing, quicker answers.

Local Consent Know-how

Proven record with Irish and UK planners; conditions tracked from submission to discharge.

Grid & Route-to-Market Edge

Capacity checks, grid offers and PPA/CfD strategy handled together, reducing curtailment risk.

Bankable Studies & Clear Risk

P50/P90, LCOE and embodied-carbon budgets delivered to lender standard, so funding moves faster.

Community & Stakeholder Trust

Early, transparent engagement – phasing and traffic plans that keep schools, hospitals and neighbours on side.

Sustainability First

Passive design targets, low-carbon materials and biodiversity gains embedded from concept.

Sequence 04.gif

Why Galetech?

Galetech delivers civil engineering and building works through a fully integrated, self-delivered model. Our in-house capability gives clients clarity, control and confidence from early enabling works through to final handover.

One Team, One Plan

Our planners, engineers and construction teams operate as a single unit. This reduces interfaces, eliminates hand-offs and ensures decisions are made quickly - keeping programmes moving and risks controlled.

Local Knowledge & Compliance 

With a strong track record across Ireland and the UK, we understand local authority requirements, planning conditions and site constraints ensuring works are delivered safely, compliantly and without unnecessary disruption.

End-to-End-Civil & Building Expertise

From earthworks and drainage to reinforced concrete, structural works and superstructures, we deliver coordinated civil and building packages that are practical, buildable and aligned to programme from day one.

Programme-Led Delivery

We plan civils, temporary works and structural activities around the critical path. Early sequencing, clear phasing and realistic methodologies help avoid delays and maintain momentum on live sites.

Safety, Quality & control

Safety and quality are embedded at every stage. Robust temporary works design, inspection regimes and full QA documentation ensure assets are delivered to specification and ready for long-term use.

Sustainability First

Passive design targets, low-carbon materials and biodiversity gains embedded from concept.

Team_5_edited.jpg

Our Expertise

At Galetech Group, our expertise spans the full renewable energy project lifecycle - from early development and engineering through construction, operations, and long-term asset optimisation. We deliver technically robust, commercially sound, and execution-ready solutions that help projects progress with confidence.

Our work is underpinned by strong Environmental, Social, and Governance (ESG) principles. We embed environmental stewardship, community responsibility, safety leadership, and transparent governance into every stage of project delivery to ensure our projects meet regulatory, lender, and stakeholder expectations.

Team_5_edited.jpg

Our Expertise

At Galetech Group, we deliver building projects from concept through to completion. From early-stage planning and design coordination to construction delivery and project close-out, we provide the technical expertise and practical leadership needed to keep projects moving forward.

We take a collaborative, solutions-driven approach, combining strong engineering capability with safe, efficient execution on site. The result is high-quality, reliable delivery that meets programme, budget, and performance expectations.

Blue large wave_2-min_edited.png

H&MV Engineering

"Ørsted has worked with Galetech Measurement Services on many of our renewable energy projects across the island of Ireland, and we enjoy a relationship with Galetech Group that stretches over a decade. At Ørsted we are motivated by our target to reach 17.5GW of onshore renewable capacity globally by 2030. For us to achieve this target we  delivery that they provided was first class. They have developed a turnkey system for permanent lidar install to provide the required signals to Eirgrid."

Colin Mc Cabe - Project Manager

Blue large wave_2-min_edited.png

"We recently worked with Galetech Energy Developments on the permanent Lidar solution for Drumlins Park Wind Farm.
The knowledge, service and select trusted partners like Galetech Measurement Services to work with. At Ørsted, we strive to create a world that runs entirely on green energy and we are pleased to be able to support the growth of an indigenous Irish business as we drive the energy transformation."

Drumlins Park Wind Farm

Blue large wave_2-min_edited.png

Project - St. Joseph's Secondary School 

"From our very first dealings with Galetech, we have found them to be a very professional and capable company. Our initial meetings with engineers Ciaran and Alan showed them to be pragmatic and accommodating, and they ensured that the project was completed to a top-quality standard. The groundworks team was excellent, and the supply and installation of the build happened seamlessly. From start to finish, Galetech provided top-quality service and worked with us, the client, to ensure we were fully satisfied with all aspects of the project. I would have no reservations about dealing with them again in the future."

Dáire McManamon - Principal

Blue large wave_2-min_edited.png

Project - Sports equipment storage unit

“Galetech won the contract to deliver and construct our new sports equipment storage unit. We found them to be extremely professional and responsive to enquiries and the storage unit was delivered and constructed on time and on budget. We are delighted with the storage unit which is exactly what we were looking for. It is an extremely well-constructed unit, and we are looking forward to many years of storing our equipment in it."

Tony Wheat - Sports Partnership Coordinator

Blue large wave_2-min_edited.png

Project - Doohamlet NS

"I have been very impressed with Galetech's performance on this project; they were well-organized and ran a clean, efficient job-site. Galetech understood very well how a school operates and worked with us very respectfully and with due regard for pupils, staff and our local community. Thank you, Alan Morton, Shane and the entire Galetech team."

Mrs Fiona Gallagher - Principal

News & Events

Galetech Group Announces Major Expansion

Galetech Group Announces Major Expansion

Galetech and BTS: A Strategic 50% Partnership to Power Blade Excellence

Galetech and BTS: A Strategic 50% Partnership to Power Blade Excellence

Meet the Team Driving Galetech’s e-Fuels Vision

Meet the Team Driving Galetech’s e-Fuels Vision

Abstract blue and black background with speckled dots and curved edge.

Awards and Certifications

Abstract dark blue curved design with small colorful dots on black background

Quick Links

Technologies

Onshore Wind

Offshore

Energy Storage

Solar

Hydrogen

Passive Design

Offsite Modular

Galitech Group logo with a white graphic and