top of page

Ørsted — Permanent ZX300 LiDAR for Grid-Code Compliance
Permanent ZX300 LiDAR installed to provide a continuous met-signal feed to EirGrid for the lifetime of a wind farm—fulfilling grid-code requirements without a permanent hub-height mast.
Client
Ørsted
Value
N/A
Location
Co.Cavan
Architect
GMS

Challenge
Deliver a reliable, secure, and compact permanent measurement solution that integrates with wind-farm control systems and meets EirGrid’s data interface expectations.

Solution
wo integration options offered and implemented as needed:
ZX300 integrated to existing SCADA via Modbus TCP/IP; or
Stand-alone ZX300 feeding met signals to a GMS-provided PLC, which outputs directly to the EirGrid RTU.

Outcome
Cost-effective, quickly deployed grid-compliant met signals; reduced OPEX versus installing/maintaining permanent free-standing masts.


Awards and Certifications

Quick Links
bottom of page







