80 m Met Mast Installation - Accurate Data for Wind Energy

80 m Met Mast Installation - Accurate Data for Wind Energy

Turnkey delivery of an 80 m meteorological mast, installed and commissioned to IEC 61400-50-1 with full instrumentation and remote telemetry, to provide bankable wind data for development and financing.

Client

N/A

Capacity

N/A

Location

Co.Cavan

Architect

N/A

80 m Met Mast Installation - Accurate Data for Wind Energy

Challenge

Deliver investment-grade measurements on a tight programme while managing logistics and safety on a remote site.

Blue large wave_2-min_edited.png

Solution

End-to-end delivery by GMS: site assessments, groundworks, mast erection, and instrument fit-out (First Class Advanced II anemometers at multiple heights, wind vanes, pressure & temperature sensors), plus commissioning and live telemetry.

Blue large wave_2-min_edited.png

Outcome

Zero incidents. High-resolution data stream now live, supporting ongoing resource analysis and reducing uncertainty for the client.

Homepage-Our-Values.jpg

Start Your Project with Us

Abstract blue and black background with speckled dots and curved edge.

Awards and Certifications

Abstract dark blue curved design with small colorful dots on black background

Quick Links

Technologies

Onshore Wind

Offshore

Energy Storage

Solar

Hydrogen

Passive Design

Offsite Modular

Galitech Group logo with a white graphic and
  • Instagram
  • Facebook
  • LinkedIn
  • X
bottom of page