top of page

80m Met Mast + Dual ZX300 LiDARs - Complex-Site Uncertainty Reduction
Installation of an 80 m met mast paired with two ZX300 LiDARs to validate mast data, measure above-mast heights, and reduce spatial wind-flow uncertainty across a wind-farm site.
Client
N/A
Capacity
N/A
Location
N/A
Architect
N/A

Challenge
Secure precise, bankable data over varied terrain while coordinating remote-site logistics and maintaining rigorous safety standards.

Solution
Co-located ZX300 for 3–6 months beside the mast for validation and above-mast measurements; second ZX300 redeployed to another part of the site to characterise flow variations. Delivery wrapped in GMS’s H&S, logistics and quality controls.

Outcome
Comprehensive dataset enabling tighter energy-yield assessments and project de-risking.


Awards and Certifications

Quick Links
Technologies
Onshore Wind
Offshore
Energy Storage
Solar
Hydrogen
Passive Design
Offsite Modular
Resources
bottom of page







