
Cherry Orchard Hospital
Purpose-built modular training unit providing a flexible, scalable environment for clinical education and emergency-response training scenarios.
Client
Cherry Orchard Hospital
Capacity
€400
Location
Co. Dublin
Architect
Michael Fitzpatrick Architects

Challenge
Delivering construction works on an active hospital site required speed, precision, and strict compliance. Key challenges included:
- Healthcare-grade specification and compliance within a fast-track programme (materials, safety, durability, and operational standards).
- Minimal disruption to hospital operations, with staff and services continuing throughout delivery and installation.
- A requirement for adaptable internal layouts, allowing training spaces to be reconfigured for different teaching formats and emergency-response scenarios.
- A finished facility that would remain durable and fit-for-purpose long-term, even with high daily use.

Solution
Galetech Modular Solutions implemented a modular, off-site construction approach to control quality, shorten programme timelines, and reduce on-site impact. The solution focused on performance, flexibility, and future-proofing:
- Off-site fabrication and controlled production, improving build quality and accelerating delivery while limiting disruption on the hospital campus.
-A purpose-built training unit design, aligned with healthcare operational requirements and suitable for clinical learning environments.
- Modular layout planning to support multiple room configurations, allowing spaces to be adapted for training sessions, demonstrations, and emergency-response simulations.
- A robust, healthcare-suited specification prioritising durability, cleanability, and day-to-day practicality, supporting heavy usage over time.
- Coordinated delivery and installation planning to ensure efficient site works and reduced interface with busy hospital operations.

Outcome
Cherry Orchard Hospital received a high-quality modular training facility that strengthens staff capability, preparedness, and ongoing clinical education - delivered quickly and with minimal interruption to hospital activity.
Results included:
- A durable, healthcare-appropriate training environment designed for regular use and long-term performance.
- A flexible and scalable modular space that can be reconfigured as training needs evolve.
- Fast-track delivery achieved threw off-site manufacturing and efficient installation.
- Minimal disruption to hospital services, supporting uninterrupted operations during delivery.


Awards and Certifications

Quick Links
Technologies
Onshore Wind
Offshore
Energy Storage
Solar
Hydrogen
Passive Design
Offsite Modular







