Vestas V39 Complete Nacelle Overhaul Project
Optigear - Powered by Galeetch Group demonstrated its large-scale wind turbine handling capability through the management and overhaul preparation of a complete Vestas V39 nacelle assembly.
The project involved the removal of the gearbox, main shaft, and generator for complete overhaul before reinstallation into the nacelle and final delivery back to site.
Client
Capacity
Location
Architect

Challenge
The customer required a specialist engineering partner capable of handling a complete Vestas V39 nacelle assembly while simultaneously managing the removal and overhaul of major drivetrain components.
The project required sufficient storage capacity, specialist lifting capability, and coordinated refurbishment planning to ensure the turbine components could be restored and returned to service efficiently.

Solution
Optigear - Powered by Galetech Group removed the Vestas V39 gearbox, main shaft, and generator from the nacelle assembly for complete overhaul within the Optigear facility.
Following refurbishment and testing, the components will be reinstalled into the nacelle prior to transportation and delivery back to site, ensuring the customer receives a fully prepared and integrated assembly ready for deployment.

Outcome
Through its specialist infrastructure, lifting capability, and engineering expertise, we successfully delivered a complete Vestas V39 nacelle refurbishment and reinstallation solution.
The project demonstrates our capability to support customers with full turbine component management, minimising downtime and ensuring efficient return-to-service operations.