top of page
Galetech Group logo with blue and green abstract design on black background.
Blade & Tower Services

Blade & Tower Services

Rope-access inspection, cleaning and composite repair—planned or responsive.


Deliverables

  • Blade/blade-root inspection & cleaning

  • Repair scope and QA documentation

  • Tower inspection and repair plan

  • Post-repair balance/verification

Filter out items with Sector

Case Studies

Explore how Galetech Group delivers sustainable energy solutions from concept to completion.

Effective DSO Management — Avoiding €75k Generator Hire
Blue large wave_2-min_edited.png

Effective DSO Management — Avoiding €75k Generator Hire

A 25-day DSO outage (in three blocks) was scheduled for a nearby asset connection. With no back-feed planned, the wind farm would need generators to maintain house loads.

Export Capacity Analysis — 2% Asset Output Gain
Blue large wave_2-min_edited.png

Export Capacity Analysis — 2% Asset Output Gain

EnergyPro assumed management of an operational project and found the site was not reaching Maximum Export Capacity (MEC) at the meter.

Fixing Nacelle Misalignment — 1% Immediate Production Uplift
Blue large wave_2-min_edited.png

Fixing Nacelle Misalignment — 1% Immediate Production Uplift

Routine monthly power-curve analysis flagged an underperforming turbine. A targeted investigation confirmed nacelle yaw misalignment.

Finding & Fixing Planning Compliance Problems
Blue large wave_2-min_edited.png

Finding & Fixing Planning Compliance Problems

After acquiring a third-party–managed operational wind farm, the owner discovered significant planning and environmental non-compliances.

Arva - Residential Refurbishment & Conversion
Blue large wave_2-min_edited.png

Arva - Residential Refurbishment & Conversion

Sensitive refurbishment of a listed former bank building into quality residential accommodation.

Bus Shelter - Public Realm
Blue large wave_2-min_edited.png

Bus Shelter - Public Realm

New civic bus shelter and streetscape works.

Baldonnel Defence Forces — Modular Accommodation
Blue large wave_2-min_edited.png

Baldonnel Defence Forces — Modular Accommodation

144 m² modular accommodation block with full groundworks, access ramps and M&E.

Newcastle West - Education (Temporary Accommodation)
Blue large wave_2-min_edited.png

Newcastle West - Education (Temporary Accommodation)

Supply and erection of 2 general classrooms + 3 SET prefabricated classrooms.

Foxford Modular - Science Laboratory
Blue large wave_2-min_edited.png

Foxford Modular - Science Laboratory

128 m² modular science laboratory with associated site works.

Sports Facility - Storage Building
Blue large wave_2-min_edited.png

Sports Facility - Storage Building

Design, supply & erection of a 110 m² sports storage facility incl. site works.

Killeshandra Solar - 20 kWp PV
Blue large wave_2-min_edited.png

Killeshandra Solar - 20 kWp PV

Supply, installation & commissioning of a 20 kWp rooftop PV system.

Mullahoran Solar - 7 kWp PV
Blue large wave_2-min_edited.png

Mullahoran Solar - 7 kWp PV

7 kWp PV system for a community client.

Mountainlodge Solar - 15 kWp PV
Blue large wave_2-min_edited.png

Mountainlodge Solar - 15 kWp PV

15 kWp PV system delivered over two days.

Drung Solar - 15 kW PV
Blue large wave_2-min_edited.png

Drung Solar - 15 kW PV

15-kW PV array installed and commissioned in two days.

Stradone Solar - 20 kW PV
Blue large wave_2-min_edited.png

Stradone Solar - 20 kW PV

20 kW PV system for a group company facility.

Bruskey - School Grounds Upgrade
Blue large wave_2-min_edited.png

Bruskey - School Grounds Upgrade

Playground resurfacing, new drainage & footpaths, gravel paths, fencing and handrails at a national school.

Storage Unit - 450 m² Industrial Building
Blue large wave_2-min_edited.png

Storage Unit - 450 m² Industrial Building

Design & build 450 m² sports storage facility incl. associated site works.

DPD Warehouse - 1,300 m² Industrial Unit + Offices
Blue large wave_2-min_edited.png

DPD Warehouse - 1,300 m² Industrial Unit + Offices

New 1,300 m² industrial unit with offices and 20 kV substation; full site works

Alpha Storage - 1,000 m² Industrial Building
Blue large wave_2-min_edited.png

Alpha Storage - 1,000 m² Industrial Building

1,000 m² storage facility incl. associated site works.

Gaelscoil Access Road - 300 m & Car Park (Civils)
Blue large wave_2-min_edited.png

Gaelscoil Access Road - 300 m & Car Park (Civils)

Design & construction of a 300 m access road and car park (32 spaces), new footpaths, drainage, barriers, fencing, signage, and service ducts; Cock Hill realignment for turning lane; new crossing & line marking.

St Anne’s NS, Bailieborough - Playground & Civils
Blue large wave_2-min_edited.png

St Anne’s NS, Bailieborough - Playground & Civils

Playground surfacing upgrade, kerbing, drainage and soft-play works.

Gaelscoil Cavan - School Extension (450 m²)
Blue large wave_2-min_edited.png

Gaelscoil Cavan - School Extension (450 m²)

Single-storey extension with link corridor, two SEN classrooms and one mainstream classroom incl. toilets; associated foundations, drainage, footpaths and handrails.

Cuan Centre - Ground Works
Blue large wave_2-min_edited.png

Cuan Centre - Ground Works

Project listed on the site under Civils; the dedicated page isn’t loading reliably, so only high-level information is available here.

Doohamlet National School — Modular SEN Accommodation
Blue large wave_2-min_edited.png

Doohamlet National School — Modular SEN Accommodation

Single-storey prefabricated building delivering two SEN classrooms, toilets, safe-space rooms, plus full civils (foundations, retaining walls, drainage, paths, fencing, handrails, soft-play) and connections—delivered in one phase.

St Joseph’s Secondary School, Foxford — Modular Science Lab
Blue large wave_2-min_edited.png

St Joseph’s Secondary School, Foxford — Modular Science Lab

Supply & erect a 128 m² modular science laboratory with associated site works.

Baldonnel Defence Forces — Modular Facility (Commercial)
Blue large wave_2-min_edited.png

Baldonnel Defence Forces — Modular Facility (Commercial)

Modular accommodation for defence operations

Scoil Iósaf, Newcastle West — General & SET Classrooms
Blue large wave_2-min_edited.png

Scoil Iósaf, Newcastle West — General & SET Classrooms

Supply & installation of two 65 m² general classrooms and three 16 m² Special Education Teacher (SET) classrooms.

Cherry Orchard Hospital — Modular Training Unit
Blue large wave_2-min_edited.png

Cherry Orchard Hospital — Modular Training Unit

Purpose-built modular training unit providing a flexible, scalable environment for clinical education and emergency-response training scenarios.

Connolly Hospital — Modular Facility
Blue large wave_2-min_edited.png

Connolly Hospital — Modular Facility

Modular healthcare accommodation (as presented on the project page) with emphasis on rapid deployment and compliance.

Bus Éireann — Modular Facility
Blue large wave_2-min_edited.png

Bus Éireann — Modular Facility

Modular commercial accommodation with associated site works

80 m Met Mast Installation — Accurate Data for Wind Energy
Blue large wave_2-min_edited.png

80 m Met Mast Installation — Accurate Data for Wind Energy

Turnkey delivery of an 80 m meteorological mast, installed and commissioned to IEC 61400-50-1 with full instrumentation and remote telemetry, to provide bankable wind data for development and financing.

80m Met Mast + Dual ZX300 LiDARs — Complex-Site Uncertainty Reduction
Blue large wave_2-min_edited.png

80m Met Mast + Dual ZX300 LiDARs — Complex-Site Uncertainty Reduction

Installation of an 80 m met mast paired with two ZX300 LiDARs to validate mast data, measure above-mast heights, and reduce spatial wind-flow uncertainty across a wind-farm site.

Ørsted — Multi-Site LiDAR Campaign (Ireland)
Blue large wave_2-min_edited.png

Ørsted — Multi-Site LiDAR Campaign (Ireland)

Repeat engagement with Ørsted for a turnkey LiDAR campaign: supply, deployment and commissioning of ZX LiDAR systems supporting multiple renewable projects across Ireland

Ørsted — Permanent ZX300 LiDAR for Grid-Code Compliance
Blue large wave_2-min_edited.png

Ørsted — Permanent ZX300 LiDAR for Grid-Code Compliance

Permanent ZX300 LiDAR installed to provide a continuous met-signal feed to EirGrid for the lifetime of a wind farm—fulfilling grid-code requirements without a permanent hub-height mast.

Sequence 04.gif

FAQs

1) How is Asset Management different from O&M?
O&M runs the site day‑to‑day (technicians, work orders). Asset Management governs performance, revenue, compliance and lifecycle—holding operators to contract, ensuring accurate settlements, and planning medium‑term reliability and capex. Clear, concise and professional; human, not informal.


2) What do you need to start?
Access to SCADA and meter data, key contracts (PPA, O&M, warranties, leases), recent invoices/settlements, and a site list. We typically deliver a baseline KPI pack within 4–6 weeks.


3) Can you work with our existing operators and systems?
Yes. We integrate with CMMS, trading and finance tools; we keep operators in their lane and add governance, reporting and analytics on top—no rip‑and‑replace required.


4) What KPIs will we see each month?
Availability, PR (solar), yield vs P50/P90, lost energy and recoveries, curtailment/constraint MWh, settlement adjustments, safety metrics, and progress on actions. Short, useful, and business‑ready.


5) Do you support portfolio acquisitions or refinancing?
Yes. We provide technical and operational due diligence and lender‑grade reporting as an add‑on—using the same datasets and methods we use in ongoing management.

News & Events

From Community Support to Champions: Drumcullen Camogie’s Senior B Title

From Community Support to Champions: Drumcullen Camogie’s Senior B Title

Galetech Group Announces Major Expansion

Galetech Group Announces Major Expansion

Galetech and BTS: A Strategic 50% Partnership to Power Blade Excellence

Galetech and BTS: A Strategic 50% Partnership to Power Blade Excellence

Abstract blue and black background with speckled dots and curved edge.

Awards and Certifications

bottom of page