Design & Pre-construction Readiness
Concept that builds well: layout, BoP civil/electrical/SCADA and H&S by design—wrapped in a tender-ready pack.
Deliverables
Layout drawings & BoP concept
CDM/PSDP inputs & PCI content
Employer’s Requirements / tender docs
Baseline programme and interfaces
Case Studies
Explore how Galetech Group delivers sustainable energy solutions from concept to completion.

FAQs
1) What does Design & Pre-construction Readiness cover?
We review and optimise technical design, layouts, specifications, and assumptions to ensure projects are construction-ready and aligned with planning, grid, and commercial requirements.
2) When should this service be used?
Typically post-consent and pre-FID, to de-risk design, confirm scope, and avoid changes, delays, or cost overruns during construction.
3) How do you reduce construction risk?
By identifying design gaps, interface risks, and procurement constraints early, and ensuring alignment between developers, engineers, and contractors.
4) Do you review EPC and supply contracts?
Yes. We review technical scopes, performance guarantees, and interface responsibilities to ensure designs are deliverable and bankable.
5) What inputs are required?
Approved planning drawings, grid connection details, preliminary designs, technical specifications, and draft construction contracts.
6) What are the key outputs?
Design reviews, risk registers, readiness assessments, and clear recommendations to proceed to construction.

Awards and Certifications

Quick Links
Technologies
Onshore Wind
Offshore
Energy Storage
Solar
Hydrogen
Passive Design
Offsite Modular