Concept that builds well: layout, BoP civil/electrical/SCADA and H&S by design—wrapped in a tender-ready pack.


Deliverables

  • Layout drawings & BoP concept

  • CDM/PSDP inputs & PCI content

  • Employer’s Requirements / tender docs

  • Baseline programme and interfaces

Filter out items with Sector

Case Studies

Explore how Galetech Group delivers sustainable energy solutions from concept to completion.

Monvallet Solar /Bess Project
Blue large wave_2-min_edited.png

Monvallet Solar /Bess Project

Galetech Energy Services (GES) is appointed as Owner’s Engineer for the pre-construction of the Monvallet Solar and BESS project.
50 MW Solar Farm + 134 MWh Battery Energy Storage System ( Phase 1)

Sequence 04.gif

FAQs

1) What does Design & Pre-construction Readiness cover?
We review and optimise technical design, layouts, specifications, and assumptions to ensure projects are construction-ready and aligned with planning, grid, and commercial requirements.

2) When should this service be used?
Typically post-consent and pre-FID, to de-risk design, confirm scope, and avoid changes, delays, or cost overruns during construction.

3) How do you reduce construction risk?
By identifying design gaps, interface risks, and procurement constraints early, and ensuring alignment between developers, engineers, and contractors.

4) Do you review EPC and supply contracts?
Yes. We review technical scopes, performance guarantees, and interface responsibilities to ensure designs are deliverable and bankable.

5) What inputs are required?
Approved planning drawings, grid connection details, preliminary designs, technical specifications, and draft construction contracts.

6) What are the key outputs?
Design reviews, risk registers, readiness assessments, and clear recommendations to proceed to construction.

News & Events

Sponsoring The Mater Hospital – St Vincent’s Oncology Ward

Sponsoring The Mater Hospital – St Vincent’s Oncology Ward

Galetech Group to Develop Ireland’s First e-Fuels Production Facility

Galetech Group to Develop Ireland’s First e-Fuels Production Facility

Abstract blue and black background with speckled dots and curved edge.

Awards and Certifications

Abstract dark blue curved design with small colorful dots on black background

Quick Links

Technologies

Onshore Wind

Offshore

Energy Storage

Solar

Hydrogen

Passive Design

Offsite Modular

Galitech Group logo with a white graphic and
  • Instagram
  • Facebook
  • LinkedIn
  • X
bottom of page