Installation, Testing & Commissioning

Installation, Testing & Commissioning

​From first lift to energisation-tested, compliant and on schedule.​

Deliverables​

  • Commissioning plan & ITPs​

  • Grid-code/RfG tests & evidence​

  • SCADA integration & alarm checks​

  • Punch-list management to PC

Filter out items with Sector

Case Studies

Explore how Galetech Group delivers sustainable energy solutions from concept to completion.

large-scale solar project
Blue large wave_2-min_edited.png

large-scale solar project

Our Contracts team successfully delivered a grid-connected solar PV system designed to make the most of the available roof space and sunlight throughout the day.
The system includes 506 high-efficiency solar panels and three Huawei inverters, providing a total installed capacity of 220.11 kWp.

Project Gallery

Filter by Tags
Sequence 04.gif

FAQs

1. What does Installation, Testing & Commissioning include?
This service manages the full journey from equipment installation through testing, commissioning, and energisation, ensuring assets are compliant, fully functional, and delivered on programme.


2. How do you manage FAT, SAT, and inspection test plans?
We coordinate Factory Acceptance Tests (FAT), Site Acceptance Tests (SAT), and Inspection and Test Plans (ITPs), tracking punch-list items to ensure all systems meet technical, quality, and contractual requirements.


3. Do you support grid-code and RfG testing during commissioning?
Yes. We manage grid-code and Requirements for Generators (RfG) testing, including performance verification, compliance evidence, and coordination with network operators to achieve approval.


4. How do you integrate SCADA systems during commissioning?
We oversee SCADA integration to ensure real-time monitoring, control, alarms, and data reporting are fully operational before energisation and handover.


5. What is included in the energisation plan and evidence pack?
We prepare energisation plans, safety and technical documentation, test results, compliance records, and a structured evidence pack to support final approvals and safe connection to the grid.


6. How do you ensure projects stay on schedule during commissioning?
By managing testing workflows, coordinating contractors, tracking punch-list close-outs, and resolving issues quickly, we help prevent delays and ensure assets reach commercial operation on time.

News & Events

Galetech Group Announces Major Expansion

Galetech Group Announces Major Expansion

Galetech and BTS: A Strategic 50% Partnership to Power Blade Excellence

Galetech and BTS: A Strategic 50% Partnership to Power Blade Excellence

Meet the Team Driving Galetech’s e-Fuels Vision

Meet the Team Driving Galetech’s e-Fuels Vision

Abstract blue and black background with speckled dots and curved edge.

Awards and Certifications

bottom of page